Science First Pest Control · Serving 12 cities

PESTGOGOPESTGOGO

Pharma & GMP

Pharma pest control your QA team can trace

For pharma, nutraceutical and cosmetics plants and warehouses. Methods agreed by area class, changes through your change control, every action on record.

Clean laboratory bench with a microscope, analysers and sample bottles on white shelving

Risk

What can go wrong

  • Contamination of product or packaging

    Insects, rodent activity or pest-control products reaching exposed product, packaging or controlled areas.
  • Deviations without a root cause

    Repeated activity closed as “treated” without an investigation, which then reappears in the next audit.
  • Vendor qualification gaps

    Missing or expired vendor documents found during a customer or regulatory inspection.
  • Uncontrolled changes

    A product, device or dose changed by the contractor without your approval or a risk assessment.
  • Warehouse ingress

    Rodents and crawling insects entering API, excipient and packaging stores through docks, doors and pallets.
  • Incidents near exposed product

    A pest found close to an open process, with no defined containment or investigation route.

Method

How we work

  1. Zoning by area class

    Each area gets an approved-method matrix, from external perimeter to controlled areas, with routine spraying excluded from production where you require it.

  2. Design pests out

    Gap closure, dock and door control and monitoring come before treatment, with engineering actions documented and tracked.

  3. Site-approved products

    Only products on your approved register are used. Any change goes through your change control with a risk assessment.

  4. Monitoring and trending

    Rodent stations, traps and fly catchers are numbered, inspected and trended monthly, with catches classified.

  5. Deviation and CAPA

    Repeated or unusual activity is raised as a deviation, investigated, corrected and checked for effectiveness.

  6. Audit trail

    Every visit is recorded with who did what, when and where, and which actions were closed.

Pharma & GMP

Frequently Asked Questions

GMP and governance

How will your programme avoid contaminating products, packaging and controlled areas?

With zoning by area class: each zone has its approved methods and products, and anything not listed for a zone is not used there.

What documents can you provide for vendor qualification?

Send us your vendor-qualification list. We provide registrations, insurance, product labels and safety data sheets, SOPs and training records for review.

MoreLess

A downloadable document index will be published in our library; it is marked “coming soon” until the real document is ready.

How do you control changes to a pesticide, device, dose or method?

Through your change control. We propose the change with a risk assessment, and nothing changes until your QA team approves it in writing.

Can we restrict specific chemicals or ban routine spraying in production?

Yes. The site-approved product list and the zone matrix reflect your restrictions, and non-chemical controls come first.

What happens when monitoring shows repeated pest activity?

It is raised as a deviation: investigated, given a root cause and a corrective action, and verified for effectiveness before it is closed.

Can your reports show who did what, when, and what was closed?

Yes. Each service record names the technician, the date and time, the areas and devices covered, the findings and the actions closed.

Monitoring, warehouses and incidents

How do you protect API, excipient and packaging warehouses?

With a programme for docks, doors, pallets and the perimeter: proofing, receiving checks and numbered monitoring devices, inspected on schedule.

How do you place and trend fly catchers without creating a contamination risk?

They are placed away from exposed product and openings, catches are classified, and counts are trended every month.

Do monitoring devices or inspection tools need calibration or verification records?

Some do. We list which equipment needs calibration or a functional check, and keep the evidence with the site file.

Are your technicians trained in GMP behaviour, gowning and site hygiene?

Technicians follow our training programme plus your site induction, gowning and hygiene rules, and the training records are kept per person.

Can one corporate QA team compare pest trends across several plants?

Yes, when all plants use the same measures and names. We set up reports so trends can be compared plant by plant.

What do you do if a pest is found near exposed product or packaging?

Contain the area, escalate to your QA team at once, support the investigation and product decision, and document the closure.

For purchase teams

Questions procurement asks before appointing a vendor

Commercial comparability, service evidence and contract terms, answered before the RFQ.

Procurement

Can the scope be made comparable across vendors, so the lowest rate isn’t misleading?

Yes. Our proposal sets out the scope line by line: pests covered, areas, visit frequency, manpower, devices, consumables and exclusions.

MoreLess

Ask every vendor to quote against the same lines. Once the scope is the same, the rates become comparable, and gaps such as missing devices or fewer visits are easy to spot.

What is included in the monthly rate, and what is charged separately?

The proposal lists both before you sign: what the monthly rate covers, and any one-time charges for devices, equipment or replacement consumables.

Which statutory and vendor documents will you submit before work starts?

Send us your vendor-registration checklist and we’ll provide each document with its validity date before mobilisation.

MoreLess

Keeping expiry dates visible lets your team track renewals instead of finding a lapsed document during an audit.

Will technicians be dedicated or shared, and who supervises them?

It depends on the size and risk of the site, and it is written into the proposal: dedicated or visiting technicians, the supervisor, and how often the supervisor visits.

How do I know a scheduled service was actually done?

Every visit ends with a service report: date, time, areas covered, products used and findings, signed off by your site contact.

MoreLess

Ask to see the report format before you appoint us, and check that each report matches the agreed schedule.

Who owns bait stations, fly catchers, traps and their replacements?

The proposal states who owns each device and who pays for replacements, so there are no surprises at renewal or exit.

How do you control chemical use around employees, food and sensitive areas?

Products and methods are agreed area by area before work starts, and restricted zones are written into the site plan.

MoreLess

Product labels and safety data sheets are available to your team for every product used on site.

Which measures can procurement use to judge vendor performance?

Response against the agreed times, repeat activity in the same zone, open corrective actions, complaint closure time and audit findings.

MoreLess

We agree which measures apply to your site at the start, so the review discusses the same numbers every time.

How will you take over from our current vendor without losing device history?

We start with a baseline survey and keep the existing device numbering and records where your current vendor hands them over, so trends continue instead of restarting.

What happens to devices and data at the end of the contract?

The proposal sets out what you receive at the end: a device inventory, the service records for your site and a closing report.

Documents

Related documents

See what each document covers before you ask for it.

All documents

Next step

Talk to us about your site

Request a site survey or quotation

Pests or problems (optional)

Site type, area, what you are seeing, any audit or deadline.

How should we contact you?